Extraction management at Duqueco Cuel: Efficiency and control of water rights
Duqueco Cuel, Los Ángeles.

01
Problem
Lack of visibility and precision in water intake at the diversion structure, making it difficult to comply with DGA regulations on effective extractions.
02
Challenge
Implement a robust measurement solution at a critical point (the intake) to ensure exact control of the flow entering the network.
03
Solution
Installation of T5 LG equipment, enabling precise, real-time monitoring to optimize distribution and ensure legal compliance.




